"We Value Finished Product" - About Us
"We Value Finished Product" - Company Message

Rennaker Surfaces manufactures and installs solid surface products for commercial projects nationally.
The company was founded in 2013 to become the leading supplier of solid surface product in the commercial and government sectors using the highest quality people to work with, process that's enjoyable and product that's the best in the business.



2017 (current)

Renovate Barracks 267 Fort Irwin, CA
This project was performed for Spooner Woodworks. This Project consists of Supply and install of 68 living quarters Corian solid surface counters and sills. We will also deliver and install the cabinets. 

Jaurez Lincoln Port of Entry Laredo, TX
This project is also being performed for Brasfield & Gorrie. For this project we are tiered under Remmert & Company for the millworks install. We will be installing typical wood cabinets and (3) 40' tall wood slat wall paneling. 

Convent Port of Entry Laredo, TX
This project is being performed for Brasfield & Gorrie. The scope is install only of a variety of different divisions. Rennaker is contracted to install division 6 cabinets and counters. Stainless steel cabinets and counters. Division 08 doors / hardware metal and wood. Installation of division 10 specialties and toilet accessories. For this project we also grinded floors and level set an existing slab originally poured in 1930. Something new to our list of different trades are the ongoing installation of exterior bollards. 

*NEW RENNAKER FABRICATION FACILITY IS OPENED IN LAS VEGAS, NV

Q4/BQ Renovate Building R-61 Norfolk, VA
This project was performed for RQ Construction. The scope was 191 living quarters with solid surface shower enclosures, solid surface countertops with integrated sinks, service cabinets, wire shelving, and solid surface window sills. During this project we were called upon by the GC to install division 10 due to shortage of craftsman in the local area. 

Herman Hall Navy Post Graduate School Monterey, CA
This project was performed for Stellar Construction. For this project we were tiered under Spooner Woodworks for the millworks and stone countertops install. The scope was 77 custom living quarters with very detailed wood casework, crown/base moulding and chair rail. For this project we also installed the Cambria manufactured stone. 

FY13 SOF Battallion Operations Facility JBLM, Washington
This project was performed for RQ Construction. The scope was supply and install of solid surface shower enclosures, solid surface countertops with integrated sinks, service cabinets, wire shelving, and solid surface window sills. 

Renovate BEQ 781 and 782 Coronado, CA
This project was performed for I.E. Pacific Construction. For this project we were tiered under Maron & Associates. The scope was installation of 64 typical living room wood casework, fabrication and installation of solid surface countertops and shower enclosures

Renovate Bldg 31603 Camp Pendleton, CA
This project was performed for I.E. Pacific Construction. For this project we were tiered under Maron & Associates. The scope was fabrication and installation  of 8 gang shower enclosures, countertops and drill sergeants rooms.


2016

AC Marriot Ashville, NC
This project was performed for Yates Construction. For this project Rennaker was tiered under David Allen Company. This Project was the installation of a 120 hotel room shower enclosures using the new Mincey Marble Products.

Tustin Army Reserve  Tustin, CA
This project was performed for COX Construction. For this project we were tiered under Spooner Woodworks. The scope was installation of wood casework, supply and install solid surface countertops.

P-500 LCS Training Support Facility
This project was performed for Mortenson Construction. For this project Rennaker was tiered under Wilson Kitchens. This Project was the install of a mock version of a ships bulkhead.

LIDL Distribution Warehouse Graham, NC
This project is being performed for The Whiting Turner Company. The scope was supply and install of a  variety of different divisions. Rennaker was contracted to supply and install division 6 cabinets and solid surface counters. Installation of division 10 specialties and toilet accessories. For this project we also provided and installed all fire extinguishers and cabinets. Something new to our list of different trades are the ongoing installation of clarus glassboards.

P-939 Engine Dynomometer Facility Barstow, CA
This project is being performed for Sundt Construction. The scope was supply and install of a  variety of different divisions. Rennaker was contracted to supply and install division 6 cabinets and solid surface counters. Installation of division 09 tile, vinyl install with rubber cove base. Supply and install of division10 specialties and toilet accessories. For this project we also provided and installed all fire extinguishers and cabinets. Something new to our list of different trades are the ongoing installation of bathroom combination lockers. 

BEQ Modernization of Barracks Building 856 Naval Air Station Lemoore, CA
This project was performed for Harper Construction.  For this project we were tiered under Spooner Woodworks. This Project was the install of millworks in 128 typical living quarters cabinets and shelving with some common area casework as well.

MCAGCC 29 Palms project 29 Palms, CA
- Supply only of 48 solid surface niches for RQ construction.

Child Medical and Dental Facility MCAGCC 29 Palms, CA
This project was performed for T.B. Penick and Sons Construction. For this project we were tiered under Spooner Woodworks for the millworks and stone countertops install. The scope was installation of wood casework, solid surface countertops and custom wood wall features. 

Child Development Center MCAGCC 29 Palms, CA
This project was performed for T.B. Penick and Sons Construction. For this project we were tiered under Spooner Woodworks for the millworks and stone countertops install. The scope was installation of wood casework, supply and install of solid surface counters with integrated sinks, coved fullheight splash.

Renovate Starship Barracks Ft. Benning, GA
This project was performed for Brasfield & Gorrie. The scope is install only of a variety of different divisions. Rennaker was contracted for Installation of division 10 specialties and toilet accessories. This project had 16 bath/shower rooms that had partitions 24 toilet and shower compartments for each room.



2015

VA School Housing BEQ Quantico, VA
This project was performed for Harper Construction. For this project we were tiered under West Coast Countertops for solid surface countertops install. The scope was  264 living quarters with solid surface window sills and solid surface countertops with integrated sinks. 

Renovate Barracks KL,KM,KQ Norfolk, VA
This project was performed for RQ Construction and DPR. The scope was 414 living quarters with solid surface window sills shower enclosures, solid surface countertops with integrated sinks, service cabinets, wire shelving, and solid surface window sills. 

Combat OPS Facility Camp Lejeune, NC
- Interior punch team for RQ construction. 

MARSOC Facility Camp Lejeune, NC
- Interior punch team for RQ construction. 

*NEW RENNAKER FABRICATION FACILITY IS OPENED NEAR LAUGHLIN,NV

Medical Facility Renovations Ft. McConnel AFB, KS
This project was performed for Kirlin Construction. The scope was provide and install Divisions 06 and 10. 


2014

French Creek BEQ Camp Lejeune, NC
- Interior punch team for Sundt Construction. 

Renovations Coronado Norfolk, VA
This project was performed for RQ Construction. The scope was 16 ADA quarters  solid surface shower enclosures.

*FIRST RENNAKER FABRICATION FACILITY IS OPENED IN PARENTS GARAGE

P-136 Cherry Point, NC
This project is being performed for RQ Construction. The scope was supply and install of a  variety of different divisions. Rennaker was contracted to supply and install division 6 cabinets and solid surface counters. Installation of division 09 tile, vinyl install with rubber cove base. Supply and install of division10 specialties and toilet accessories. For this project we also provided coordination and safety managers to assist RQ in field operations.


2013

Wallace Creek Phase 2  Camp Lejeune, NC
This project was performed for Brasfield & Gorrie and RQ Construction.This project was performed for Maron & Associates.. This Project was for the install of cabinets and plam shelving in 402 typical living quarters.  During this project we were called upon by the GC's to install division 09 due to shortage of craftsman in the local area. 

Wallace Creek Phase 2  Camp Lejeune, NC
This project was performed for Brasfield & Gorrie and RQ Construction.This project was performed for Maron & Associates.. This Project was for the install of cabinets and plam shelving in 402 typical living quarters.  During this project we were called upon by the GC's to install division 09 due to shortage of craftsman in the local area. 


















Location:
Rennaker Surfaces Inc.
6965 Speedway Blvd. Suite X109
Las Vegas, NV 89131


Hours:
Mon - Fri: 9AM - 5PM
Sat: 10AM - 5PM
Sun: Closed

Website Builder provided by  Vistaprint
MapQuest Terms and Conditions Maps/Directions are informational only. User assumes all risk of use. MapQuest, Vistaprint, and their suppliers make no representations or warranties about content, road conditions, route usability, or speed.